
The exterior thermal insulation works of the single-block educational building of Beypazarı Gazi Gündüzalp Middle School were carried out by MSM Architecture & Engineering within the scope of the KABEV Project. The main contractor was Vadi Altyapı, and the consultancy firm was Tima Engineering, with all processes executed under the coordination of these organizations.
The application included surface preparation, thermal insulation system (ETICS), mesh and plaster works, and final coating applications, all completed in accordance with technical specifications. Aiming to improve the building’s energy efficiency and strengthen its façade durability, this project once again demonstrates MSM Architecture & Engineering’s high implementation quality in public sector projects.